正在加载页面 · Loading page
正在加载页面 · Loading page
Environmental engineering · Class of 2027
I monitor urban waterways continuously. Instead of one sample and one report, I measure the same cross-section for thirty-six months, until season, rainfall and upstream construction each show themselves.
By the numbers
Sampling records, 2021–2024
40% of the outliers turned out to be the sampling method
The one figure I most want read. When the data is dirty, suspect your own bucket before you suspect the river.
36
Months of continuous monitoring
8
Fixed cross-sections
14k
Individual readings
Experience
Three roles. The first two have pages of their own.
8 sections
Monthly sampling and quality control across eight fixed cross-sections; rewrote how outliers get adjudicated.
Mar 2026 — PresentHangzhou
11 km
A dry-season census of outfalls along eleven kilometres of bank.
Jun 2025 — Sep 2025Shaoxing
9 months
Kept the sample archive and the instrument calibration log.
Sep 2024 — May 2025Hangzhou
Education
Focus: long-run urban waterway monitoring
Sep 2025 — Present
Thesis on outfall census methodology
Sep 2021 — Jun 2025
Suspect your own bucket first.
Taped to the lab wall